Captain’s Log – Day 25

      Hull design is ready. We still need to optimize the shape of the centerboards and rubbers. Also the draft was designed for a boat weighted about 18 tons, which will also be more optimized.

      Anyway, the interior inside the hulls is now finished: four double bedrooms, two bathrooms, two toilets and two storage rooms inside the hulls. More storage is available into the bridge deck, so it is ready to care at least 8 people for a longer travel.

      Now it’s time to design the roof. This will be the most important energy producing part of the boat, because it must include at least 4 KWp of solar panes. Nik, our designer works hard, so soon you’ll see the result.